Justin NgaiSingapore real estateLet’s chat
D04 · Upcoming

Keppel Bay Plot 6

Keppel (Keppel Bay Pte Ltd)

Considering a home here? Let’s chat about the layouts, budget and alternatives.

Developer facts checked · 12 November 2026 · ERA snapshot · 2 October 2026

Location map with a pin for Keppel Bay Plot 6 on Keppel Island, beside Marina at Keppel BayERA portal marketing image
Tenure99-year leasehold
Homes84
CompletionNot announced
Stock snapshotNot booking stock

Keppel has not announced a launch date. ERA’s portal shows March 2027 as an indicative month, which is provisional.

Preliminary portal entry. Confirm the project name, launch timetable and approved materials before making plans.

At a glance

Get the details before you decide.

Keppel Bay Plot 6 is a 99-year leasehold condominium project by Keppel (Keppel Bay Pte Ltd). Keppel’s 2025 annual report lists 84 homes.

Developer & site

What is Keppel Bay Plot 6?

Keppel Bay Plot 6 is a residential site on Keppel Island, the small island that holds Marina at Keppel Bay. Keppel’s 2025 annual report lists it as a proposed 84-unit waterfront condominium on 99-year leasehold land of 43,701 sqm (about 470,400 sq ft). The site is held by Keppel Bay Pte Ltd, which Keppel owns in full.

Keppel’s reports still call it Keppel Bay Plot 6. EdgeProp’s new launch directory lists 84 homes by Keppel Bay Pte Ltd at Keppel Bay Vista under the name The Island Residence. Keppel has not published a launch date, floor plans, unit sizes or a completion date.

Two figures differ between sources. ERA’s portal entry shows 86 homes and freehold tenure. Keppel’s own report says 84 homes and 99-year leasehold, and this page uses Keppel’s figures.

Sources: Keppel annual report 2025, major properties · EdgeProp directory. Checked 12 November 2026.

Location

Where is Keppel Bay Plot 6, and how near is the MRT?

The site is on Keppel Island, beside Marina at Keppel Bay. The island joins the mainland by Keppel Bay Bridge, so every trip on foot or by car starts across the bridge. Reflections at Keppel Bay and Corals at Keppel Bay are about 300 m away across the water.

Telok Blangah MRT (CC28) is about 810 m away in a straight line and HarbourFront MRT (NE1, CC29) about 860 m. The walk is longer because of the bridge. VivoCity is about 1 km away. The Circle Line became a full loop on 12 July 2026, when Keppel, Cantonment and Prince Edward Road stations opened, so it now runs from HarbourFront on to Marina Bay.

No primary school is within 1 km. Blangah Rise Primary School is the nearest, about 1.4 km away. Check the official distance on OneMap before relying on it for registration.

Map of Keppel Island, beside Marina at Keppel Bay for Keppel Bay Plot 6, showing Telok Blangah MRT to the north-west, HarbourFront MRT to the east, Reflections at Keppel Bay to the north and Corals at Keppel Bay to the east.
Map: OneMap | Map data © contributors, Singapore Land Authority. Places located with OneMap on 14 November 2026. Lines on a map are straight; walking routes are longer.

Straight-line distances measured on OneMap on 12 November 2026. Circle Line: LTA, 14 May 2026.

Compare

Keppel Bay Plot 6 vs the other Keppel Bay condos

Keppel has been building out Keppel Bay since Caribbean at Keppel Bay was completed in 2004. Plot 6 would be the smallest of the waterfront condos there by a wide margin. This compares published project facts only; ask me for a like-for-like comparison of a specific home.

Keppel Bay Plot 6Reflections at Keppel BayCorals at Keppel BayThe Reef at King’s Dock
DeveloperKeppelKeppelKeppelMapletree, Keppel
Homes84 (proposed)1,129366429
Tenure99-year leasehold99-year leasehold99-year leasehold99-year leasehold
CompletedNot announced201120162024

Sources: Keppel annual reports 2023 and 2025 · EdgeProp, 21 January 2021. Checked 12 November 2026.

Get Keppel Bay Plot 6 updates first

Want the floor plans, price list and showflat dates as soon as they are released? Message me on WhatsApp and I will send them to you, with a comparison against the homes you are already considering.

Compare the home types

Unit mix & layouts.

Home types, floor areas and stock were recorded by ERA on 2 October 2026. Current availability may differ. Confirm the latest unit list before making a decision.

A unit mix is not included in this snapshot. The approved brochure will provide the current layout details when available.

For the latest brochure or a closer look at a particular layout, let’s chat.

The neighbourhood

MRT connections & primary schools.

Distances are ERA portal estimates, not walking routes. Stations marked future are planned connections. Opening dates are subject to LTA updates. Where a current opening status is unconfirmed, check LTA before relying on the connection. For school planning, confirm the address and registration rules with MOE and OneMap.

MRT stations

Not included in this snapshot.

Primary schools

Not included in this snapshot.

Check official school distance · MOE registration framework updates

Open location in Google Maps
The grounds

Read the site plan.

A site plan is not included in this snapshot. We’ll check the latest developer materials before comparing stacks.

Questions buyers ask

Keppel Bay Plot 6: launch date, tenure and units

When is Keppel Bay Plot 6 launching?

Keppel has not announced a date. ERA’s portal shows March 2027 as an indicative month, which is provisional. Message me and I will let you know as soon as it is confirmed.

Is Keppel Bay Plot 6 freehold?

No. Keppel’s annual report lists the land as 99-year leasehold, the same as the other Keppel Bay condos.

How many units will Keppel Bay Plot 6 have?

84, according to Keppel’s 2025 annual report. ERA’s portal shows 86.

Is The Island Residence the same project?

EdgeProp lists The Island Residence as 84 homes by Keppel Bay Pte Ltd at Keppel Bay Vista, which matches Plot 6. Keppel’s own reports still use the name Keppel Bay Plot 6.

Are the floor plans and showflat details out?

Not yet. Keppel has not released floor plans, unit sizes or a showflat date. Check these in the sales documents before committing.

Page last updated 14 November 2026.

Other upcoming launches I am following

See my guide to 2027 new launch condos

Sources & update notes.

ERA public project page

Retrieved 2 October 2026. Unit counts and availability may change. Keppel has not announced a completion date; the portal’s earlier estimate is not shown. The sale contract governs completion obligations. Project images are developer marketing materials.

Compare your options

Other projects in this area.

WhatsApp me