SellingERA portal marketing imageTerra Hill
22B YEW SIANG ROAD
Keppel (Keppel Bay Pte Ltd)
Considering a home here? Let’s chat about the layouts, budget and alternatives.
Developer facts checked · 12 November 2026 · ERA snapshot · 2 October 2026
ERA portal marketing imageKeppel has not announced a launch date. ERA’s portal shows March 2027 as an indicative month, which is provisional.
Preliminary portal entry. Confirm the project name, launch timetable and approved materials before making plans.
Keppel Bay Plot 6 is a 99-year leasehold condominium project by Keppel (Keppel Bay Pte Ltd). Keppel’s 2025 annual report lists 84 homes.
Keppel Bay Plot 6 is a residential site on Keppel Island, the small island that holds Marina at Keppel Bay. Keppel’s 2025 annual report lists it as a proposed 84-unit waterfront condominium on 99-year leasehold land of 43,701 sqm (about 470,400 sq ft). The site is held by Keppel Bay Pte Ltd, which Keppel owns in full.
Keppel’s reports still call it Keppel Bay Plot 6. EdgeProp’s new launch directory lists 84 homes by Keppel Bay Pte Ltd at Keppel Bay Vista under the name The Island Residence. Keppel has not published a launch date, floor plans, unit sizes or a completion date.
Two figures differ between sources. ERA’s portal entry shows 86 homes and freehold tenure. Keppel’s own report says 84 homes and 99-year leasehold, and this page uses Keppel’s figures.
Sources: Keppel annual report 2025, major properties · EdgeProp directory. Checked 12 November 2026.
The site is on Keppel Island, beside Marina at Keppel Bay. The island joins the mainland by Keppel Bay Bridge, so every trip on foot or by car starts across the bridge. Reflections at Keppel Bay and Corals at Keppel Bay are about 300 m away across the water.
Telok Blangah MRT (CC28) is about 810 m away in a straight line and HarbourFront MRT (NE1, CC29) about 860 m. The walk is longer because of the bridge. VivoCity is about 1 km away. The Circle Line became a full loop on 12 July 2026, when Keppel, Cantonment and Prince Edward Road stations opened, so it now runs from HarbourFront on to Marina Bay.
No primary school is within 1 km. Blangah Rise Primary School is the nearest, about 1.4 km away. Check the official distance on OneMap before relying on it for registration.

Straight-line distances measured on OneMap on 12 November 2026. Circle Line: LTA, 14 May 2026.
Keppel has been building out Keppel Bay since Caribbean at Keppel Bay was completed in 2004. Plot 6 would be the smallest of the waterfront condos there by a wide margin. This compares published project facts only; ask me for a like-for-like comparison of a specific home.
| Keppel Bay Plot 6 | Reflections at Keppel Bay | Corals at Keppel Bay | The Reef at King’s Dock | |
|---|---|---|---|---|
| Developer | Keppel | Keppel | Keppel | Mapletree, Keppel |
| Homes | 84 (proposed) | 1,129 | 366 | 429 |
| Tenure | 99-year leasehold | 99-year leasehold | 99-year leasehold | 99-year leasehold |
| Completed | Not announced | 2011 | 2016 | 2024 |
Sources: Keppel annual reports 2023 and 2025 · EdgeProp, 21 January 2021. Checked 12 November 2026.
Want the floor plans, price list and showflat dates as soon as they are released? Message me on WhatsApp and I will send them to you, with a comparison against the homes you are already considering.
Home types, floor areas and stock were recorded by ERA on 2 October 2026. Current availability may differ. Confirm the latest unit list before making a decision.
A unit mix is not included in this snapshot. The approved brochure will provide the current layout details when available.
For the latest brochure or a closer look at a particular layout, let’s chat.
Distances are ERA portal estimates, not walking routes. Stations marked future are planned connections. Opening dates are subject to LTA updates. Where a current opening status is unconfirmed, check LTA before relying on the connection. For school planning, confirm the address and registration rules with MOE and OneMap.
Not included in this snapshot.
Not included in this snapshot.
Check official school distance · MOE registration framework updates
Open location in Google MapsA site plan is not included in this snapshot. We’ll check the latest developer materials before comparing stacks.
Keppel has not announced a date. ERA’s portal shows March 2027 as an indicative month, which is provisional. Message me and I will let you know as soon as it is confirmed.
No. Keppel’s annual report lists the land as 99-year leasehold, the same as the other Keppel Bay condos.
84, according to Keppel’s 2025 annual report. ERA’s portal shows 86.
EdgeProp lists The Island Residence as 84 homes by Keppel Bay Pte Ltd at Keppel Bay Vista, which matches Plot 6. Keppel’s own reports still use the name Keppel Bay Plot 6.
Not yet. Keppel has not released floor plans, unit sizes or a showflat date. Check these in the sales documents before committing.
Page last updated 14 November 2026.
Retrieved 2 October 2026. Unit counts and availability may change. Keppel has not announced a completion date; the portal’s earlier estimate is not shown. The sale contract governs completion obligations. Project images are developer marketing materials.