SellingERA portal marketing imageSkies Miltonia
9 MILTONIA CLOSE
Upcoming integrated development at Chencharu Close, near Khatib MRT · Yishun, District 27
Evia Real Estate / Gamuda Land / Ho Lee Group
Considering a home here? Let’s chat about the layouts, budget and alternatives.
Project update · 26 October 2026 · Location estimates from ERA, 2 October 2026
ERA portal marketing imageChencharu Central Residences is the upcoming 99-year leasehold mixed-use project at Chencharu Close in Yishun. This page previously used the land-sale name, Chencharu Close GLS. The development combines private homes with shops, a hawker centre and a bus interchange.
HDB awarded the site to Evia MCS Pte. Ltd., Gamuda (Singapore) Pte. Ltd. and H108 Pte. Ltd. on 26 September 2025. Gamuda’s public project page describes up to 875 homes and up to 12,600 sqm of commercial space. These are preliminary project figures, not a final unit allocation or released price list.
The practical attraction is having everyday shopping, food and bus connections within the development, with Khatib MRT nearby. Before paying a premium for that convenience, compare the actual home with a completed alternative around Khatib or Yishun. Check usable space, noise, privacy and the route you would take each day.
A growing neighbourhood does not guarantee investment returns. For an own-stay purchase, the layout and your move-in plan matter as much as the surrounding transformation.
Use my new-launch versus resale comparison checklist to compare specific homes. If you are selling an HDB flat, the HDB-to-condo upgrade guide helps organise the sale and purchase timeline.
Chencharu is a new housing area between Khatib and Yishun, planned to add about 10,000 homes by 2040, most of them public housing. Chencharu Close, the site of Chencharu Central Residences, is the first private housing site in the area. You may also see it called the Chencharu condo, Chencharu Residences, Chencharu Central or the Chencharu Close GLS.

The site was tendered as a mixed-use development: about 875 homes above up to 135,627 sqft of commercial space, which includes a bus interchange and a hawker centre. The tender set aside at least 58,125 sqft for the bus interchange and 37,674 sqft for the hawker centre, on a site of 316,997 sqft. Gamuda has said the project is to be completed within 84 months of the September 2025 award.
For drivers, LTA expects the North-South Corridor to open in phases from 2029 (the viaduct section from Admiralty Road West to Lentor Avenue) and from 2031 (the tunnel section to the ECP).
Sources: EdgeProp on Chencharu · EdgeProp on the tender · Gamuda announcement · LTA North-South Corridor. Checked 6 November 2026.
North Park Residences at Yishun is the closest comparison: an existing condo built into a mall with a bus interchange and MRT next to it. It shows how the integrated set-up works day to day, and its resale homes are an alternative if you need to move in sooner.
| Chencharu Central Residences | North Park Residences | |
|---|---|---|
| Developer | Evia, Gamuda Land, Ho Lee Group | Frasers Property |
| Homes | About 875 | 920 |
| Integrated with | Shops, hawker centre, bus interchange | Northpoint City mall |
| Nearest MRT | Khatib (NS14) | Yishun (NS13) |
| Status | Launching soon | Completed, resale |
Source: Frasers Property on Northpoint City. Checked 6 November 2026.
Want the floor plans, price list and showflat dates as soon as they are released? Message me on WhatsApp and I will send them to you, with a comparison against the homes you are already considering.
A confirmed developer price list, detailed bedroom-by-bedroom unit mix and individual floor plans have not been verified for this page. Do not treat a research budget, an indicative psf assumption or a land-cost figure as a selling price.
Start with the bedrooms you need, a workable total budget and when you need to move. Once the approved plans are available, compare room dimensions, storage, ventilation and circulation rather than floor area alone. Include the cost of any temporary accommodation while waiting for completion.
For the latest available information and a comparison that fits your plans, let’s chat.
Distances are ERA portal estimates, not walking routes. Stations marked future are planned connections. Opening dates are subject to LTA updates. Where a current opening status is unconfirmed, check LTA before relying on the connection. For school planning, confirm the address and registration rules with MOE and OneMap.
Check official school distance · MOE registration framework updates
Open location in Google MapsA final developer site plan and stack-specific details have not been verified here. Before choosing a unit, check its relationship to the bus interchange, retail access, roads, facilities and neighbouring blocks. An artist’s impression does not establish the final view, noise level or pedestrian route.
Yes. Chencharu Central Residences sits on the first private housing site in Chencharu, so searches for the Chencharu condo, Chencharu Residences, Chencharu Central or the Chencharu Close condo all point to this project.
The exact preview and booking dates remain unconfirmed on this page. Preliminary agency schedules differ, and the public developer page checked on 26 October 2026 does not give a firm date. Confirm the latest timetable before arranging a visit or making plans around it.
A confirmed price list and individual floor plans have not been verified here. Ask for the latest approved materials, then compare a specific unit’s total price, layout, floor and facing. No starting price is advertised on this page.
HDB’s tender estimate and Gamuda’s public project description refer to about 875 homes. The final approved count and detailed mix may differ; check the current developer sales documents.
Yes. Gamuda describes the project as five minutes from Khatib MRT. The older ERA portal estimate in the MRT section is a distance estimate, not a verified walking route. Check the final access point and the walk you would actually use.
The planned development includes commercial space, a hawker centre and a bus interchange. Final operators, opening dates and access arrangements should be checked when released.
A contractual completion date has not been verified here. The older portal’s 2029 date is not presented as a current commitment. Check the developer timetable and sale documents before planning a move.
No. This is Justin Ngai’s independent property information page. Information is dated and subject to confirmation; an enquiry does not reserve a unit.
No prices are out yet. I worked out what the homes around it have sold for, bedroom for bedroom, from URA caveats and the land prices nearby.
Page last updated 14 November 2026.
ERA location estimates and retained marketing imagery are from the 2 October 2026 snapshot. The project name has been updated; the old portal launch and completion dates are not treated as current commitments.
Public facts checked on 26 October 2026: HDB’s Chencharu Close tender award and Gamuda’s Chencharu Close announcement. Unit numbers, specifications and schedules remain subject to the approved sales documents. Prices and layouts should be checked against the latest developer materials.